2. Atingidos pela Barragem do Rio Gavião/Anagé. "Terceira ocupação do Canteiro de obras da Barragem de Anagé. Manifesto n°. 5." Anagé, Barracão do Acampamento:, 1988 May 27.
Item — Box: 6
Scope and Contents
Work has been stopped for the third time, due to the workers? pay being one month overdue.
Dates
- Creation: 1988 May 27.
Physical Description
2 p.
Repository Details
Part of the Benson Latin American Collection, The University of Texas at Austin Repository
Contact:
2300 Red River Street
Austin Texas 78712 United States
(512) 495-4578
bensonspecialcollections@austin.utexas.edu
2300 Red River Street
Austin Texas 78712 United States
(512) 495-4578
bensonspecialcollections@austin.utexas.edu