Jose Melchor Sanchez Navarro at Hacienda del Tapado to Don Rafael Delgado: Started work on dam next day after reaching hacienda. Cleared away remains of dam built in 1800. The new dam is 24 3/4 varas long, and 5 varas wide. Gives other details. One servant ran away, Undated:
Item — Box: 1, Item: 787
Dates
- Creation: Undated:
Physical Description
genreform: A.L.S
Repository Details
Part of the Benson Latin American Collection, The University of Texas at Austin Repository
Contact:
2300 Red River Street
Austin Texas 78712 United States
(512) 495-4578
bensonspecialcollections@austin.utexas.edu
2300 Red River Street
Austin Texas 78712 United States
(512) 495-4578
bensonspecialcollections@austin.utexas.edu